Hi all
guy wants a ground mount system (4KW) pre march 3rd.
He wants to add more modules down the line so asked if i could install a 3 phase inverter and meter now to make way for future.
Am i right in suggesting i install on single phase meter and inverter now, that way if Tariff does happen to meet 43p pre march, and he wants more added later it would work out better to add a separate array on another of the phases with its own gen meter that way he would get 43p for one array and 21p for the other?
Hope that makes sense?
thanks
guy wants a ground mount system (4KW) pre march 3rd.
He wants to add more modules down the line so asked if i could install a 3 phase inverter and meter now to make way for future.
Am i right in suggesting i install on single phase meter and inverter now, that way if Tariff does happen to meet 43p pre march, and he wants more added later it would work out better to add a separate array on another of the phases with its own gen meter that way he would get 43p for one array and 21p for the other?
Hope that makes sense?
thanks