Not available for the EU market as yet as far as I am aware
Discuss New system, string or micro inverters in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net
scaffold @ £400 per time to change them if the company complies with the law in UK.
Without assessing the site, there is no way of knowing exactly how much of a shading issue you believe you have. Sometimes it is much less or much more severe than a customer realises.
Having shading doesn't mean you automatically need to have MI or optimisers. Get someone to come in and design you a system properly.
What size supply do you have in the house? if only single phase then you'll have to apply to DNO to connect more than 16a (3.68kW). If you have 3 ph then you'll be ok.
The DNO may let you connect 8kw on single phase without any upgrade works, if not then you'll have to pay for upgrades (poa with DNO)
I won’t have any shading issues on the garage 3kw system.
The house will have shading issues (this time of year) if I use the on the long roof at the back (chimney on the back was removed last week), see attached photo taken at the weekend @11:45am
But won’t have any on the side of my the trees on that side are toy trees only 15ft high, but can only fit 2.5kw system.
I’m thinking that if I use the garage 3kw with string inverter in the garage. Use the side of the house 2.5kw and maybe the top of the back roof for another 1-1.5kw as it won’t have shading issues that high.
If you are happy with the standard of work done by the aerial fitter and conservatory installer, then go with the cheapest you can get.
Reply to New system, string or micro inverters in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.