You notify when the jobs finished.

who decides when the jobs finished?

you do.

as stated above no one cares, its not policed, the councils had the idea put on them, as said half of them no not how it works or why its there.

just notify it when you've finished. At least youve done it properly....
 
I've just got off the phone with a bloke from the Labc he confirmed they only accept notifications applied for beforehand or remergency repairs and the fee has being altered to £180 plus vat since I originally enquired

They are not aware of any way of allowing proven competent persons (ie qualified, experienced, previously assessed ) notifying without belonging to a CPS for a much smaller fee
But said if I can provide the legislation under which other Authorities have allowed this to happen then they would have to rethink this, but they would still set their own fees to whatever they deemed appropriate
 
Last edited:
My inspector told me once you receive your welcome pack, notify online and just change the dates. But i had already notified through labc so no need, if you are that worried talk to your scheme provider and get some solid answers.
 
Ok so don't know what happened to that post, so I'm going to write again

Dillb what was your point exactly ? an answer giving factual information would have nice even if you don't agree , I'm more than happy to be corrected

I was in the same boat as the op and this was how things worked out for me, and I was just giving a constructive reply on what I was told ,

Whether or not I was informed correctly or not is down to the members of the Niceic and
Labc I had contact with

I had the intention of doing things correctly, why else would anyone bother joining a scheme otherwise
So you follow the guidance of the scheme this is what I was advised by the Niceic , so I rang the Labc and that was what I was told by them

Its their game and to play, its their rules ! and they weren't going to change their minds because of my call!



No I didn't fail the assessment but they wrote to me stating it as a noncompliance a week afterwards, and said until the situation had been rectified I was not able to trade as an Niceic contractor, so it was effectively as good as a fail

Labc prosecution's we all know it never happens, but this is not the point , notification is a legal requirement as you know
 
Edexlab sounds like u had a bit of bad luck.

My inspector said to me he drew a line under what is in the past just notify everything from now on.
 
No it wasn't so bad a mate already a member of another scheme notified it for me, he said it was a farce!
its a stupid system anyway why on earth could they not have made provision for this and allowed people to notify, once they'd passed
 
No it wasn't so bad a mate already a member of another scheme notified it for me, he said it was a farce!
its a stupid system anyway why on earth could they not have made provision for this and allowed people to notify, once they'd passed

Because, like there seems to be alot of nowadays, it wasn't thought through properly, and was implemented with ineptitude & mediocrity.
 

Reply to NICEIC Visit, test result sheets in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Similar Threads

Hi Guys, hopefully someone will know the answer. Testing an install on a (domestic) PME system I have a garage consumer unit supplied from one of...
Replies
17
Views
2K
Hi, need some advice, I moved over from Sse in 2020 to Octpus energy. Whilst I was with SSE I was on E10 when I went over to octopus they put me...
Replies
1
Views
482
Hello all, I've just been perusing the AM2/E/S threads on here. Thought you might like a bit of a review. If, like I did, you find yourself...
Replies
7
Views
2K
Morning All I recently completed my first re wire and board change, (with help from the owner who is a gas fitter and plumper, who works with my...
Replies
0
Views
1K
Eh up :) I've done some new PDF forms for BS7671 18th Edition Amendment 2 2022 (the Big Brown Book), based on the IET model forms. You can fill...
Replies
27
Views
12K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock