sajeel
-
- Reaction score
- 49
Got called to a factory, a cable had melted, removed the fuse holder to find a screw was used for fusewire!!
Had a similar situation 2.5 mm used for tails on 3 meters, Chinese so called electrician caused street wire to burn out. Edf pulled out fuse and said get a real electrician. Lol