Hello all...hope someone here can help....
currently have three phases coming in to the property (old farm) but only receive single phase with a single phase meter. The overhead cables were upgraded a few years ago so the cabling up to the meter is all fairly recent, I can see the 3x100amp fuses on the grids side of the meter, only one is used
the supplier is asking for 'maximun load reading for each phase' and 'maximum load in kVA expected for the site' which they say they need so they can determine what kind of upgrade is required.
I could total up all the lights/appliances for the site maximum but what do they want to know when asking 'maximum load reading for each phase'?
I thought it would just be a case of changing the meter...
currently have three phases coming in to the property (old farm) but only receive single phase with a single phase meter. The overhead cables were upgraded a few years ago so the cabling up to the meter is all fairly recent, I can see the 3x100amp fuses on the grids side of the meter, only one is used
the supplier is asking for 'maximun load reading for each phase' and 'maximum load in kVA expected for the site' which they say they need so they can determine what kind of upgrade is required.
I could total up all the lights/appliances for the site maximum but what do they want to know when asking 'maximum load reading for each phase'?
I thought it would just be a case of changing the meter...