Hi.
I am planning to fit two storage heaters - 2.55kW and 3.4 kW. They will be feeded from two 2.5 mm2 T&E cable from CU, just before connected via DP 20A switch. Will it be good to mount at CU timer like that:
2 Channel 16A Weekly Digital Time Switch with Key EG005 | CEF - http://www.cef.co.uk/catalogue/products/167140-2-channel-16a-weekly-digital-time-switch-2-c-o-contacts-c-w-key-eg005
I am planning to fit two storage heaters - 2.55kW and 3.4 kW. They will be feeded from two 2.5 mm2 T&E cable from CU, just before connected via DP 20A switch. Will it be good to mount at CU timer like that:
2 Channel 16A Weekly Digital Time Switch with Key EG005 | CEF - http://www.cef.co.uk/catalogue/products/167140-2-channel-16a-weekly-digital-time-switch-2-c-o-contacts-c-w-key-eg005