- Reaction score
- 5,607
Morning guys..
I recently did a job (partial rewire) with a builder, since then he has rang me and asked me to wire up his girlfriends small new extension. He is a decent chap and was very patient and helpful with my first partial rewire (he was the project manager). Because of this and also because I expect he will ask me to help him out on other rewires (hes just moved to the area) I have given what I think is a VERY, VERY reasonable quote, but it's just good to hear from others whether its as good as I think??
I'm unsure of the exact dimensions but the extension is a double bedroom and onsuite shower room, thats it!
Heres what I will be doing:
4 double sockets in bedroom
4 down lights in bedroom
extractor fan and 2 down lights in bathroom.
New Supply to electric shower
I will be supplying all the materials (bar the shower and 2 bathroom downlights)
I have quoted the materials at cost price (based on about 15m's 1mm, 30 m's 2.5mm, 15m's 10mm so approx £200-£240) and guessed at labour at being 2 days (I have charged £120 p/day and said if I over run I wont charge anymore)
Does that sound very good or just reasonable?
I recently did a job (partial rewire) with a builder, since then he has rang me and asked me to wire up his girlfriends small new extension. He is a decent chap and was very patient and helpful with my first partial rewire (he was the project manager). Because of this and also because I expect he will ask me to help him out on other rewires (hes just moved to the area) I have given what I think is a VERY, VERY reasonable quote, but it's just good to hear from others whether its as good as I think??
I'm unsure of the exact dimensions but the extension is a double bedroom and onsuite shower room, thats it!
Heres what I will be doing:
4 double sockets in bedroom
4 down lights in bedroom
extractor fan and 2 down lights in bathroom.
New Supply to electric shower
I will be supplying all the materials (bar the shower and 2 bathroom downlights)
I have quoted the materials at cost price (based on about 15m's 1mm, 30 m's 2.5mm, 15m's 10mm so approx £200-£240) and guessed at labour at being 2 days (I have charged £120 p/day and said if I over run I wont charge anymore)
Does that sound very good or just reasonable?