I have purchased a property and need to run power about 50m to a garage. Planning to get everything ready so a sparky can just finish it off. I have 2 questions before starting project.
1. Will 2.5mm twin core+earth be large enough?
2. Can it run from existing garage or should I dig trench to the fuse box which will add another 25m onto the length.
1. Will 2.5mm twin core+earth be large enough?
2. Can it run from existing garage or should I dig trench to the fuse box which will add another 25m onto the length.