Recent content by uksrevivor

  1. U

    Career and qualification advice

    To the OP the answer to your question is no you will not gain a JIB approved electrician by just completing the AM2 exam you will need to complete your NVQ 3 portfolio which will require an NVQ assessor that you register with to sign off certain aspects of work you do i.e on a commercial site...
  2. U

    AM2 Fault finding failure. Bonding splan motor circuit

    To the OP What a brilliant thread this is. To all that have replied i have to thank you all as it is most informative and this is exactly how us trainees learn on such issues. The replies have been very useful and this is why im still a member of this forum as you can learn a lot from it...
  3. U

    Newly qualified electrician

    To the OP its an absolute insult paying that rate. The petro/ chemical industry is a specialised field and if you have done your time in this field fair play to you and dont even think twice about working for that hourly rate. Check what testing and commissioning electricians are earning and...
  4. U

    Part P ...................

    Massive 1 you are right its not a qualification but a lot of Electrical Trainee courses make it out to be.I think some even offer a certificate of competence in part P but it is worthless.
  5. U

    Part P ...................

    Part P is the notification of electrical works carried out in domestic properties. It stipulates what work is notifiable to LBC and what is not. To comply with Part P regulations means you understand what electrical work is notifiable and what is not i.e special locations e.t.c. and you have...
  6. U

    Am I being asked for a Ze reading before any work?

    Agree with the above post as if you read the OPs post it states Check the safety of electrical systems prior to the commencement of inspection, testing and commissioning"... The commissioning being energising a circuit or circuits.
  7. U

    Need help for achieving a fully qualified electrical qualification

    Patrik you have experience in this field albeit in another country so try applying to the employment agencies as an electrical improver if you have the ECS card it will be the ancillary operative grade but that is all that is required to get onsite as an improver.
  8. U

    Need help for achieving a fully qualified electrical qualification

    Sorry just read post #2 again, try and find out what the equivalent qualification you have achieved in Italy relates to in the U.K you may find you wont have to pass certain parts of the city & guilds courses.
  9. U

    Need help for achieving a fully qualified electrical qualification

    It seems that your problem lies within applying for jobs as an electrician as, and please dont take offence to this you are not an electrician with your current qualifications. A qualified electrician status will be someone who has undertaken the city and guilds 2365 level 2 & 3 and will have...
  10. U

    tray separation or not ???????

    Its probably because the Data Guys cant do containment work and have robbed your nice tray work to pin there cables to.
  11. U

    Friday morning stupidity,nearly didn't make lunch time!

    A momentary lapse of reason I bet it did bloody hurt as well lol
  12. upload_2018-6-22_20-6-47.jpeg

    upload_2018-6-22_20-6-47.jpeg

  13. U

    Advice wanted on retraining as an Electrican about courses and tools needed.

    To the OP from my experience and im in my mid 40s a recognised technical college will always be far more respected by your possible future employer than the fast track route some other providers will provide. I have commented on previous posts on this subject in this forum. I started to retrain...
  14. U

    companys refusing to pay CIS?

    All this umbrella company crap needs scrapping. employment agencies offer a rate on an hourly basis and then you find out that you have to pay the umbrella company to process your wages which is about £20 per week, this over a 40 hour week drops your rate by 50p an hour, you then have to pay...
  15. U

    BG smart meter installation... thoughts please

    Surely the 10mm T&E is the customers side of the install nothing to do with the suppliers side and should not of been connected by BG meter installer. The smart meter is fitted directly after the DNO cut out fuse and then the smart meter feeds the consumer unit. I dont think it should of been...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock