Hi .
I am testing a block of flats with a conduit system as the cpc, when i fill in the cert i can confirm that the live cable is 1.5mm but what do i write for the cpc when useing the r2 lead method , do i just write N/a
Also
I am testing a block of flats with a conduit system as the cpc, when i fill in the cert i can confirm that the live cable is 1.5mm but what do i write for the cpc when useing the r2 lead method , do i just write N/a
Also