Does anyone have a scheme connecting RCD with UPEU, with details on how wires are connected on reglette and further on UPEU. Can someone explain how alarm is generate when RCD goes down, and where is RCD stationed in rack?
Here is the picture of ports on SLPU:
which should be connected to UPEU extalm0 or extalm1
Here is the picture of ports on SLPU:
which should be connected to UPEU extalm0 or extalm1