Discuss GU10 lamp holders with LONG leads ? in the Electrical Tools and Products area at ElectriciansForums.net

LukeD

-
Esteemed
Arms
Reaction score
1,332
Just bought 20 holders for a 12v-GU10 conversion job. Are they making the leads shorter now ? ! By the time they are enclosed in a Wago box .There is not a lot of cable left !
 
Most 'off the shelf' GU10 holders come with about 5 inches of wire

I have seen some GU10 holders with extra long wires but these are usually special order

How much wire is on the ones you bought ?
 
Be quicker and better to fit new fittings surely? Can be had for £4 a can in jcc. Push fit terminals too, wago box, lamp holder and wagos must come to £3 per time?
they are one of those dumb sizes .probably fittings that where sold in B&Q in the 80s ! They just wanted a fast option .
 

Reply to GU10 lamp holders with LONG leads ? in the Electrical Tools and Products area at ElectriciansForums.net

Similar Threads

I having been trying to make a cart wheel chandelier for my wedding in July like the one in the photo attached. I have 31 lamp holders in mason...
Replies
1
Views
1K
I commissioned an EICR to be done on a property that is in Wales as this is now a requirement in order to let on any new tenancies after 1st...
Replies
1
Views
2K
Hello I have some decking lights which to be fair, have been nothing but pain in the bottom since they were installed. Moisture in the lens lamps...
Replies
10
Views
2K
I have 60+ of these Aurora down lights in 12v MR16 format and want to convert them to 230V GU10 LED by changing the lamp holder for something like...
Replies
9
Views
3K
I had an interesting little job this morning. Three sockets in an extension were not working and haven't worked for quite some time (years). It...
Replies
0
Views
313

Electricians Tools | Electrical Tools and Products

Thanks for visiting ElectriciansForums.net, we hope you find the Electricians Tools you're looking for. It's free to sign up to and post a question yourself to find a tool or tool supplier either local to you, or online. Our community of electricians and electrical engineers will do their best to find the best tool supplier for you.

We also have a Tiling Tools advice from the worlds largest Tiling community. And then the Plumbers Forums with Plumbers Tools Advice.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock