B
bjd91
Hey,
I've just past my trade test and was placed on a new build to complete the 2nd fix
as the guy who roughed it has left.
Anyway, he's wired the lights using the loop method at the switches, I've never did this
previously as I would always do the joint at the ceiling rose, this has thrown me
when it came to connecting a 3 gang 2way switch at the top of the landing.
There are 2 feeds, 2 switch wires, a 3 core (2way) and a fan cable.
What's the correct/best way to connect this?
Any help appreciated
Thanks
I've just past my trade test and was placed on a new build to complete the 2nd fix
as the guy who roughed it has left.
Anyway, he's wired the lights using the loop method at the switches, I've never did this
previously as I would always do the joint at the ceiling rose, this has thrown me
when it came to connecting a 3 gang 2way switch at the top of the landing.
There are 2 feeds, 2 switch wires, a 3 core (2way) and a fan cable.
What's the correct/best way to connect this?
Any help appreciated
Thanks