- Reaction score
- 726
I just tell the DNO where to put the cut out. They put in the supply cable (or move the old one if practical) fit the cut out, then the meter person connects the meter to the cut out and the two or four pole isolator. That's it. Never been asked for any thing to prove that whatever may be connected to that isolator by me is safe. They do there bit what happens after the isolator is my problem.