- Reaction score
- 0
Hi we have been asked to run a 3 phase supply into a boiler house to feed a DB fed from next to the existing meter. Would we need to install Tails to a switch fuse or could we just install a rotary isolator? Just tight for space near the Meter and switch fuses are big. Thanks