NICEIC Certification Scheme Upcoming NICEIC Assessment

Discuss Upcoming NICEIC Assessment in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

I passed the "approved contractor scheme"! 🤩

I was really nervous as you all know but the assessor was a really nice guy, really knowledgeable and the best bit was....he was a vaper so we both chilled out vaping and drinking as many brews as we could between jobs.
Paperwork was all in order but he picked me up on a slight error in my Section 7 Observations but it really was a minor thing really.

I took him to the golf course as planned which went perfectly, the staff there gave us free coffee and food (the staff know me very well as I look after their electrics) so that was good of them. Went to 3 jobs in all, two commercial one domestic.

Simple tests really, Ze (Earthing Conductor disconnected), Zdb, Zs, r1 + r2, RCD trip times, ring final testing no IR though.

I ensured I proved dead each time with an approved voltage indicator and known supply (martindale) and ensured I set the correct Torque settings for each conductor when re-connected.

Once I got into the flow of things and realised that he wasn't there to trip me up, things went really well.

Thanks to all you guys for the valued input, it means a lot to me that there are people out there like me who just need a little lift up sometimes due to lack of confidence. We are not all super-sparks as much as we like to think we are. :D

Mike.
 
I passed the "approved contractor scheme"! 🤩

I was really nervous as you all know but the assessor was a really nice guy, really knowledgeable and the best bit was....he was a vaper so we both chilled out vaping and drinking as many brews as we could between jobs.
Paperwork was all in order but he picked me up on a slight error in my Section 7 Observations but it really was a minor thing really.

I took him to the golf course as planned which went perfectly, the staff there gave us free coffee and food (the staff know me very well as I look after their electrics) so that was good of them. Went to 3 jobs in all, two commercial one domestic.

Simple tests really, Ze (Earthing Conductor disconnected), Zdb, Zs, r1 + r2, RCD trip times, ring final testing no IR though.

I ensured I proved dead each time with an approved voltage indicator and known supply (martindale) and ensured I set the correct Torque settings for each conductor when re-connected.

Once I got into the flow of things and realised that he wasn't there to trip me up, things went really well.

Thanks to all you guys for the valued input, it means a lot to me that there are people out there like me who just need a little lift up sometimes due to lack of confidence. We are not all super-sparks as much as we like to think we are. :D

Mike.
'Took him to the golf course' :cool:
No wonder you passed :)
Good for you Mike. It does feel great once you've passed and they have gone.
 
'Took him to the golf course' :cool:
No wonder you passed :)
Good for you Mike. It does feel great once you've passed and they have gone.
Hehehe. Gotta grease the wheels where you can. He was well happy with the free food n brews. :)

Didn't get a single observation on my report which I'm really happy about so maybe he felt the little niggles he spotted were not worth a mention to the people higher up?

Thanks bud, the sheer relief I felt when I shut the front door was unreal. Wife and family are overjoyed so it's all good.

Onwards and upwards eh....đź’Ş
 

Reply to Upcoming NICEIC Assessment in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Similar Threads

Hi all. I recently failed a section of my AM2E assessment. Passed 7/10 but failed on some silly things I'm confident of correcting second time...
Replies
1
Views
420
NICEIC Certification Scheme NICEIC renewal assessment debacle!
Hi All, I recently had my NICEIC renewal assessment. We are a two man band. We only carry out small local work and we are approved contractors &...
Replies
14
Views
6K
Hi All I'm just about to start on my own and been wondering, how do you guys arrange your assessment visit to the customers properties? Are the...
Replies
10
Views
2K
Hi everyone, I've recently gone self employed, running my own business and am looking to join either NAPIT or NICEIC. Firstly, which do you...
Replies
6
Views
5K
Hi, looking for some advise please. Ive applied for NICEIC registration and I’m awaiting my assessment, my problem is that I’ve been advise by...
Replies
17
Views
7K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock