Cheers Guys. thought it would be a can of worms myself, just thought there might be some wonder product that I hadn't heard about that might help. Will need to look first and see how bad, might be an option to repair and solder an earth to the lead which was mentioned but that might come back...
Hi All. got a call today from the plasterers to see if I can repair a cable they chopped whilst chiselling. going to have a look tomorrow but they have informed me its lead sheathed. I've seen it before but never had anything to do with it. I'm guessing its un repairable and rewire is the...
Going back in the next few days just to go over a few things so got a few more options to think about thanks to you and the rest of the forum. will keep you posted on any changes.
Regards Daz...
Thanks engineer,the job itself is a nice one to do being empty on the side that needs a rewire.What do you think about the two showers?I think if the two of them together draw a touch over 85amps and theres a few more appliances on then the 100 amp should still hold out for good length of time...
Thanks to all,at the moment it seems the dno want to charge for two supplies and that's why they want to run off one. Only problem with that is the two 10.5 kw showers and one 100 amp supply fuse.Maybe not likely to blow but would be a real pain if it did.Timbobelfast thanks for that, that could...
Hi all. customer is converting two houses into one. one half already modernised and rewired, other half to do. there is two supplies into the property but wants the dno to cut one off and use the supply from the modernised side with a new consumer next to the original, so basically two consumer...
ok i see what you mean, unfortunately its been two seperate buildings made into one with two metering points. but thanks to all, i'd better get my miners lamp and try and find a way through.:cry_smile:
that,s a good question snowhead, there is also a small consumer unit in the new middle bit thats fed from a swa what looks to run back to the single phase board of which i'm 95% sure.
Thanks engineer. looking at the heating system, it seems to be fed from the single phase supply in one building with pipe work and radiators continuing to the next and all pipework crossbonded back to the single phase board.
Thanks for the quick response. they are not pme. one building is three phase and one building is single phase, and are being run as two seperate buildings, so there are two mets. the idea being it failed because the two mets need linking to create one.
Hi guys. been asked to look at a job where two buildings have been made into one, where a building as been erected in between and combined to make one building. been like this for a while and had numerous inspections and passed.now recently its had ecir done and failed because there are two...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.