Not sure if picture has uploaded. I opened up the main incoming box on outside wall to find the tails had been split in a Henly block and into an enclosure with a 100A main switch in it. Out of this there was an armored cable out to a separate building in the garden with a 5-5 split board. The armored gland is on but not made into the enclosure. Just the cores go in !!
Imsuggeting making the armored off into a metal adaptable box under the box and replacing the enclosure with a 80 fused cut out. Any other suggesions apart from run a mile!!! her are 9 ccts in use it as basically been made into an appartent but there is no kitchen
 

Attachments

  • IMG_0131.jpg
    233.3 KB · Views: 259
Not sure if picture has uploaded. I opened up the main incoming box on outside wall to find the tails had been split in a Henly block and into an enclosure with a 100A main switch in it. Out of this there was an armored cable out to a separate building in the garden with a 5-5 split board. The armored gland is on but not made into the enclosure. Just the cores go in !!
Imsuggeting making the armored off into a metal adaptable box under the box and replacing the enclosure with a 80 fused cut out. Any other suggesions apart from run a mile!!! her are 9 ccts in use it as basically been made into an appartent but there is no kitchen


The Cowboye are in town I see, what a b---s up, or as Clint Eastwood's boss in heartbreak ridge would say it's a Cluster----.
 
Typical diy/builder job

do as you say with the adaptable box, but then an appropriatley sized bit of t&e from ad box to 2way cu, then insert appropriatly sized mcb into 2way cu

is the board at the other end of the swa rcd protected?
 
Nice, glad I work in industrial where everything is done correctly lol :)

I was told the bloke who did the install worked in industrial lol the other end is spot on dual rcd board etc the only thing I picked up on was non fire rated downlights( a screwfix shopper I think lol) The mains end may have been someone else but the customer will never tell us lol
 
Is the swa used as the earth or is one if the cores use, if so you only have to earth the swa at one end which could be the far end so then all you have to do is neatly terminate the end in the cut out box using a stuffing gland .
 
Is the swa used as the earth or is one if the cores use, if so you only have to earth the swa at one end which could be the far end so then all you have to do is neatly terminate the end in the cut out box using a stuffing gland .

They have used one of the cores but I would still make off the armored utilising the banjo with an earth off it in case the customer sticks a shovel through it
 
Is the swa used as the earth or is one if the cores use, if so you only have to earth the swa at one end which could be the far end so then all you have to do is neatly terminate the end in the cut out box using a stuffing gland .


Wrong, wrong, totally wrong.
Do the FMEA's on that design and it is totally unacceptable, end of story, it is downright dangerous.
 
I was told the bloke who did the install worked in industrial lol the other end is spot on dual rcd board etc the only thing I picked up on was non fire rated downlights( a screwfix shopper I think lol) The mains end may have been someone else but the customer will never tell us lol

Do they need to be fire rated?
 
I was told the bloke who did the install worked in industrial lol the other end is spot on dual rcd board etc the only thing I picked up on was non fire rated downlights( a screwfix shopper I think lol) The mains end may have been someone else but the customer will never tell us lol
Don't screwfix sell fire rated downlights then??
 

Reply to Came across this today in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Afternoon all, Just wondering what everyone's response to the following scenario is. Letting agents have asked us to carry out an EICR. There was...
Replies
42
Views
5K
This is quite lengthy so get comfy... I had a bizarre call out relating to a job I attended about five years ago. The situation was they were...
Replies
11
Views
1K
These are going to become the norm aren't they? I've been reading this...
Replies
10
Views
2K
Hi everyone Ive just had an electrical condition report conducted on a mixed-use property, and I am extremely surprised that after the last report...
Replies
11
Views
2K
  • Locked
  • Sticky
Beware a little long. I served an electrical apprenticeship a long time ago, then went back to full time education immediately moving away from...
Replies
55
Views
5K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock