- Reaction score
- 10
What is the proper procedure for ELI testing circuits with UPS back up, ie radial circuits under computor room floors?
Do you test with the mains bypass connected? with the UPS/ mains in normal operation? or in UPS status only?, ie mains failure.
Thanks.
Do you test with the mains bypass connected? with the UPS/ mains in normal operation? or in UPS status only?, ie mains failure.
Thanks.