Discuss guide to enrolment of part p schemes in the Business Related area at ElectriciansForums.net

also if any members want to share what will be asked in the assessments please do so as there are a few on these too
 
Questions will come in general laid back format if you answer tooo confidently expect to be probed further. I think they sometimes try to test your max Ze.

lol, only joking to a point they need to know if your Zs meets requirements.


Q.How do you do an end to end test? A.well so and so
Q.can you show me? A. ok
Q. what will you expect to find? A. L & N = Cpc 1.67 x >
Q. what are your readings? A. blah blah
 
Last edited by a moderator:
Re: Step by step for NICEIC Assessment,

Some examples of questions will be things like:

(When measuring a Ze or Zdb) What earthing system is this? and what is the maximum Ze reading you can to obtain?
(When testing an RCD) What is the maximum disconnection times on x1 and x5 rated tripping currents?
(When carrying out a pfc and psc test) What does that information mean regarding your chosen MCB's?

You will likely be asked to illustrate your safe isolation procedure also.
 
Last edited by a moderator:
anyone know how the part p equivelent works in scotland and what it intails looked for info but cant find a difinitive answer
 
in regards to getting sites sorted for registration wit NIC on the domestic installer program, can anyone lead me in the right direction in terms of notifying to building control first so that i can do the work and wait for NIC to take up to a month to come and visit work? Cheers
 
be grateful if any of the more experienced members could steer us in the right direction? Doing installations and testing is fine... but the bits surrounding work is a bit more tricky. Muchos appreciated. Volers
 
the bits surrounding work is a bit more tricky ????????????????????

Yes the installation and testing processes are not an issue otherwise i wouldnt be applying to be a domestic installer. However the legal aspects of getting any electrical installation works signed off by building control when you are awaiting assessment is confusing as it costs over 200 pounds for notification to building control. Hence the issue.
 

Reply to guide to enrolment of part p schemes in the Business Related area at ElectriciansForums.net

Similar Threads

NICEIC Certification Scheme Getting accredited to
Looking for some advice regarding joining a CPS. I've been in the electrical industry in various roles for nearly 10 years. I started my...
Replies
15
Views
936
Hi Folks , Just looking for a bit of advice as I'm looking to get back on the tools so please bare with me if this is a bit long winded. I'm a...
Replies
1
Views
601
Hi all Just qualified last Monday and I have completed both initial and periodic test and inspection courses. What is the process for joining the...
Replies
2
Views
1K
Hi, I had been with Elecsa for years as a Part P installer/tester. Then they were taken over by the NICEIC. I'm embarrassed to say that I hate...
Replies
6
Views
1K
Hi there, firstly wishing you all good health and happiness 🙂 Just a few questions if you all don’t mind answering for me please.. I’ve just...
Replies
1
Views
604
OLDBOY
O

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock