Hi Guys
A friend of my mates is setting up a micro brewery in a small industrial unit. The unit is fed by a 3 phase 100amp supply
the brewery plant is on order and the boiling part of the plant is fitted with 3 x 18kw (3 phase) immersions, then another piece of equipment has 1 x 18kw 3 phase immersion in it.
then he want a couple of small 3 phase pumps wired in ( only a couple of amps each), then there is the ring main in the unit, the flood lighting, 3kw 230v fridge plant (that sounds a bit big to me but that is what he said the size would be)for the cold room and a electric roller shutter door.
I dont think the supply is man enough you views pls
thx
Bigfoots
A friend of my mates is setting up a micro brewery in a small industrial unit. The unit is fed by a 3 phase 100amp supply
the brewery plant is on order and the boiling part of the plant is fitted with 3 x 18kw (3 phase) immersions, then another piece of equipment has 1 x 18kw 3 phase immersion in it.
then he want a couple of small 3 phase pumps wired in ( only a couple of amps each), then there is the ring main in the unit, the flood lighting, 3kw 230v fridge plant (that sounds a bit big to me but that is what he said the size would be)for the cold room and a electric roller shutter door.
I dont think the supply is man enough you views pls
thx
Bigfoots