Currently have 3x100a cutouts, one going to a single phase meter, other two not in use.
Have been given a reasonable quote to change to 3 phase meter.
When they come out to change it will they add the extra live cables from cutout to meter and meter to isolator?Can't see how there's any other way but have been searching threads and seen meter installs refused because of too much insulation cut off the wires...why not just change them when it must be part of the job anyway?
The 3P meter might have to be moved from where the single phase one currently is if its much bigger...there's space on the board about 15 inches away but could that cause a problem?
Thanks
Have been given a reasonable quote to change to 3 phase meter.
When they come out to change it will they add the extra live cables from cutout to meter and meter to isolator?Can't see how there's any other way but have been searching threads and seen meter installs refused because of too much insulation cut off the wires...why not just change them when it must be part of the job anyway?
The 3P meter might have to be moved from where the single phase one currently is if its much bigger...there's space on the board about 15 inches away but could that cause a problem?
Thanks