I'm applying for a new electric supply.
UK Power Networks have requested an accurate breakdown of the "required kVA load".
ALL ELECTRIC 2 BED FLAT.
I have worked out my requirements as below in watts, but am struggling to convert to the "ADMDs in kVA" they require.
Lights: 280w
Sockets: 3200w
Hob/oven: 2500w
Shower: 10000w
Hot water instant boilers (2of) : 20000
Radiators : 14000
Total 61000w
What is the ADMD I require?
And
The kVA load required?
Tia