- Reaction score
- 5,382
same goes for private services (boreholes)...if you can ensure there will be no `upgrades` or tampering etc...I must admit that if any upgrading to the water system took place where the old lead water mains was cut off in the road you would still have anything up to 30m of buried lead pipe in the ground.
This now being obsolete would make a very nice 'twigg' and then on used as the earth electrode for the installation. One would assume that RCDs/RCBOs were in place if the Ra was too high.........
I've just managed to get a front row seat - you can stuff the pop corn !