I’ve been asked in install a new outdoor socket for a customer that has a holiday static caravan but I’m confused about the testing side after. Usually I’d complete an RCD tripling time test however the caravan has an RCD on theor own board as well as an RCD on the meter. How can I ensure it’s only the local RCD on the board I test not the one on the external metering