my mate as rang me up as he is having a new kitchen fitted by b&q, they are doing the full lot electrics as well, they are putting 2 new feeds in 1 for the built in oven and 1 for the combination microwave, the house is only about 5 years old and they said they are going to have run 2 x 2.5 t&e behind the coving surface mounted which means it is going through 3 rooms behind the coving(utility room, dining room,kitchen) obviously they are within the 150mm safe zone but behind coving,my only concern is what happens if he decides to decorate and decides he doesnt want coving up anymore he is going to be left with 2 t&e left there which is then going to need sorting, would you advise b&q you dont want it behind the coving or am i just being a fussy get again lol, and another thing i couldn't quite understand is he as 4 grid switches above the work top at the moment for his other appliances and they said they will get rid of them cause they are a pain and put sockets in each cupboard at each side of the appliances from what i can gather these new appliances are going back in the same place so dont know why they are suggesting that cheers