Gasmeter65
Hi, i am rewiring a triple garage with 1st floor into a holiday cottage.
The existing property already has 2x 8.5kw showers and cottage to also have 8.5kw min shower. Also oncludes 3 cookers approx 4kw so with lights n skts approx 40 KW MAX. (over estimating it )
As this exceeds the main single phase CU rating.
( 1 half of the house is a flat with separate DB for shower cooker lights n sockets. i was thinking 3 phase as to have each DB on each phase))
The options are split or 3 phase. Has anyone come across the split phase in a domestic and if so approx costs of each.
Supply is overhead PME max length of cable 20mtrs.
Cheers
The existing property already has 2x 8.5kw showers and cottage to also have 8.5kw min shower. Also oncludes 3 cookers approx 4kw so with lights n skts approx 40 KW MAX. (over estimating it )
As this exceeds the main single phase CU rating.
( 1 half of the house is a flat with separate DB for shower cooker lights n sockets. i was thinking 3 phase as to have each DB on each phase))
The options are split or 3 phase. Has anyone come across the split phase in a domestic and if so approx costs of each.
Supply is overhead PME max length of cable 20mtrs.
Cheers