Discuss Wallbox pulsar max Install in the UK Electrical Forum area at ElectriciansForums.net
Enjoy:I have never had the pleasure of installing an EV charger, but was surprised by your comment on notifying the DNO, is that a requirement and how do they justify that?
No. It's always required. Connect and Notify if it doesn't exceed 60A/phase, otherwise Apply to Connect.So only required if the expected total load is over the DNO installation, obvious when I think about it, think it applies more to Heat Pump that may be running during the day rather than an EV charger operating over night.
I don't understand that, I can put an outside socket on my property without informing anyone?
No. It's always required.
I have an indoor 32A socket, powering a tumble drier, and that runs at near full load for hours on end. No permission required for that.
Reply to Wallbox pulsar max Install in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.