Recent content by bottlebasher

  1. B

    Load concern

    Hi All and thanks to those who take the time to reply. My concern is the amount of current the building could pull in use. I will try and give some salient facts. 160 flats over 8 floors. The landlords areas per floor consist of 20 x 20W led lights and several occasional cleaners sockets hence...
  2. B

    Testing concern

    In a refurb building in the corridors the current install is clicks (gregs) and switched fused spurs above a grided ceiling. Now the client wants a solid ceiling with no access points adjacent to clicks / spurs. Do if there were any future electrical issues it would mean access hatches. My...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock