Discuss 72 kw chidlow electraire blowing fuses in the Commercial Electrical Advice area at ElectriciansForums.net

Hi, I understand what you are saying and agreed it is reaching the end of its life but where in this heater, with resistive loading, is the extra draw of current coming from to cause this sudden problem?

That's what i'm saying ...who knows?? You have 25+ years of dust and debris to start with. Depending on what's happened to that failed heating element, you could even be picking up one portion of that element!!

On units of this size and of this age, you can be just scratching your head getting nowhere fast!! It sounds as if this unit is going to be uneconomical exercise to repair, which leaves replacement, or finding another source of heating energy to replace this unit. I personally wouldn't be wasting anymore time on it. Even if you find further problems with the elements, your not going to be able to fix them, without taking the unit and bricks apart!! It's a dead duck mate!! lol!!!
 
So i take it the fuses shown are not the ones that are blowing as you have 3 per phase? Do any of these fuses blow when the main one blows? If not surely it must be before these fuses?

Also just noticed coming out of fuses the colours, R,Y,B, - R,Y,B, - BR,R,B ? Could that be a pointer to something that went faulty in the past?

Also if the yellow phase is fully loaded (slightly overloaded) a pinched live cable that is slightly melting when the heater gets hot would not take much of a fault to bow the fuse.

Food for thought!
 
That's what i'm saying ...who knows?? You have 25+ years of dust and debris to start with. Depending on what's happened to that failed heating element, you could even be picking up one portion of that element!!

On units of this size and of this age, you can be just scratching your head getting nowhere fast!! It sounds as if this unit is going to be uneconomical exercise to repair, which leaves replacement, or finding another source of heating energy to replace this unit. I personally wouldn't be wasting anymore time on it. Even if you find further problems with the elements, your not going to be able to fix them, without taking the unit and bricks apart!! It's a dead duck mate!! lol!!!

Don't agree i have been nursing along electricair units for 30 years. Not very often i have had to give up on one. Usually it is when they have iron blocks and they get "core growth" and you can't get the blocks anymore.
 
Don't agree i have been nursing along electricair units for 30 years. Not very often i have had to give up on one. Usually it is when they have iron blocks and they get "core growth" and you can't get the blocks anymore.


So how long does it take, for you to replace the elements on these units, whether they have iron block or heat bricks??

If you have such extensive experience with these units then you must have a wiring diagram that you can pass on to jumpin jax. As far as i'm concerned, it's one thing to replace a contactor or two, than having to strip down this 72kw heaters heating bricks to remove and replace the elements, then build them back up again.... I'll stick by my initial thoughts, that this unit is past economical repair
 
So how long does it take, for you to replace the elements on these units, whether they have iron block or heat bricks??

If you have such extensive experience with these units then you must have a wiring diagram that you can pass on to jumpin jax. As far as i'm concerned, it's one thing to replace a contactor or two, than having to strip down this 72kw heaters heating bricks to remove and replace the elements, then build them back up again.... I'll stick by my initial thoughts, that this unit is past economical repair

Point 1:- On an electricair unit it takes about an hour to change the elements because you just take off the front cover and insulation. The elements slide out from the blocks and the new elements slide in.

Point 2:- I did not say i had extensive experience of these heaters. I have a good knowledge of electricair units they usually range from 6 - 18 Kw, mostly single phase. The unit in question i have never seen before but most are a variation on a theme. As you can see by my numerous posts i have been trying to help this person out, why would i not give him the wiring diagram if i had one? I also posted a link to a firm that deals with electricairs to see if they had any ideas.

Point 3:- What would a 72Kw heater cost to replace? If you give the client the choice of ripping it all out and putting a new one in or let me have a go at repairing it and it may cost a few hundred pounds but no guarantees i no what i would do.

Ill stick to my original thoughts as well!
 
Hi TC, i like your chain of thought but i would have thought that on the initial short circuit the element would have failed completely, i will try and post a picture, the 3 contactors on the left control the elements and the contactor with overload supplies the fan.


Them contactors... is the middle contact 21-22 normally-closed NC?

I can't make them out properly from the image... but now assume the markings to be of auxilaries.

:6: Please carry on...
 
Last edited by a moderator:
Engineer, TC, thanks for replies, It would certainly cost alot to replace these units and as TC says for the sake of replacing all the elements the heaters would not be written off as the only item of the whole machine that could cause trouble is the circuit board which i am sure with a bit of contactor magic could be over-ridden. I did notice the remix of colours on contactor 3. The machine, according to the data plate, weighs in at 4.5 tonne. That is alot of brick work as there is no lifting gear access. I am sure if TC had a wiring diagram he would without doubt pass it on, In these days of economic struggle i am sure this company cannot afford another heater or two just yet.
Silva.fox , all three of the contactors are either all in or out, i cannot remember at the time of the photo wether the boost was on or not, perhaps my original photo is a bit larger.
 
Point 1:- On an electric air unit it takes about an hour to change the elements because you just take off the front cover and insulation. The elements slide out from the blocks and the new elements slide in. Well, if these elements are of the solid construction and just slide out without having to dismantle the bricks you have a point!! I was assuming that the elements were the coiled type laid between the bricks!!

Point 2:- I did not say i had extensive experience of these heaters. I have a good knowledge of electrical units they usually range from 6 - 18 Kw, mostly single phase. The unit in question i have never seen before but most are a variation on a theme. As you can see by my numerous posts i have been trying to help this person out, why would i not give him the wiring diagram if i had one? I also posted a link to a firm that deals with electricairs to see if they had any ideas. Well ...you did say you have been running these heaters along for 30 years!!!

Point 3:- What would a 72Kw heater cost to replace? If you give the client the choice of ripping it all out and putting a new one in or let me have a go at repairing it and it may cost a few hundred pounds but no guarantees i no what i would do. As i said, if you needed to dismantle the bricks to replace the elements, then the cost of the elements and labour would have been a very big chunk of any replacement cost...

Ill stick to my original thoughts as well!

Well if what your saying is correct then, as i said you have a point. In which case why not go that route and replace all the duff elements. You'll then be starting from a standard set up, which is going to be far easier to fault find, than trying to compensate for various existing faults on the unit...
 

Reply to 72 kw chidlow electraire blowing fuses in the Commercial Electrical Advice area at ElectriciansForums.net

Similar Threads

I've been volunteering at my local village hall, installing audio and light systems. Converting what was originally an underused sports hall into...
Replies
68
Views
6K
When I joined this forum a decade or so back, there was a discussion going on about a welder that was connected with a 3-core cable to L1, L2 and...
Replies
3
Views
2K
Hi all, Been a few years since i've posted but here goes! At the factory I work in we have an old Spanish line from the mid-eighties that is fed...
Replies
6
Views
5K
W
Theoretically speaking If I have a 3 phase 4 wire supply L1 L2 L3 and N And the 3 hot phases are 120 degrees offset, bar any faults and line...
Replies
10
Views
2K
S
Hello fellow sparks. Just a query about a job i've been asked to do recently. I've been planning it, regarding the cable sizing and method(s) of...
Replies
13
Views
7K
sparkyjohn1
S

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock