- Reaction score
- 17,092
Went to CEF Live today, plenty of good deals, I bought a Klein mini screwdriver for £10, and with it came a set of super rods, a Klein cable tape and a Klein kneeling pad, enough of that, sat in on a NICEIC Seminar with TC and DS the were covering the proposed 18th, lots of proposals one or two which made me sit up and pay attention a bit more was the new proposes changes to Earthing and Bonding, it would seem that when the 18th come to fruition in July 2018, if the Gas and Water main pipes entering the dwelling are insulated, then there will be no need to run your 10mm2 bonding conductors, I asked for clarification on this and they were in agreement. it will also be necessary to provide an earth extra to the DNO earth, i,e, Rod, structural steelworks or building steelworks foundations Re-bar etc. Sorry can't recall much else it was peeing down and I'm whacko.