weve had a large flood from the 7th floor at work and the building is closed. The electrics turned off around 4 hours after the initial flood. The power is back on now and it got me thinking.
How would you go about making sure it was safe to initiate the power after such an event. Would it be a simple case of drying the system out as much as possible then doing some visual checks for moisture in DB's, JB's etc,
I would imagine a certain level of testing?
How would you go about making sure it was safe to initiate the power after such an event. Would it be a simple case of drying the system out as much as possible then doing some visual checks for moisture in DB's, JB's etc,
I would imagine a certain level of testing?