S
Smudge
ok ok, my humble apologies, i'll scrap everything i've learned in the last 15years by qualified electrical and engineering lecturers because you disagree. 15 years is merely a speck in the grand scheme of a career, but surely even from the heights of your high horse you might be able to see the wood for the trees. And i will also apologise for working in the 'non-prestige', lower end housing developments with the other 99.9% of sparks, the shame of us. Some day i hope to be able to look down on the rest with such contempt as you are doing.
Now if you pick up your toys, dust off the dummy, answer the original point i put forward instead of insulting the modern apprenticeship and anyone that works on a building site...can you please give the advatages of a loop in system?? and the disadvantages of it at the switches?
Now if you pick up your toys, dust off the dummy, answer the original point i put forward instead of insulting the modern apprenticeship and anyone that works on a building site...can you please give the advatages of a loop in system?? and the disadvantages of it at the switches?