Ian Smith
of the electrical installation. trying to find the answer on the internet but no luck so far. Thanks in advance.
Discuss what documents should be completed after initial veritication? in the UK Electrical Forum area at ElectriciansForums.net
of the electrical installation. trying to find the answer on the internet but no luck so far. Thanks in advance.
what kind of installation mate
2 bananas' an apple and a bike
have you replaced board or added a light etc
domestic electrical installation certificate
domestic electrical installation certificate
Minor works is one sheet to fill...elec install is 3 pages...you pick one.
No need to post thanks, you could use the 'thanks' button, that's what it's there for!ok thanks just read the other message. thanks for the help Stan
Also thanks to everyone else who has answered my question.
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'
taken straight off the notes on back of the form
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'
taken straight off the notes on back of the form
Have you been drinking tonight by any chance, Kate?Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'
taken straight off the notes on back of the form
Seriously??? Minor works.
"this minor works certificate can be used for the reporting on the condition of an alteration, addition or the INSTALLATION OF A NRW CIRCUIT TO AN EXISTING INSTALLATION and where the work has been carried out by a Competent Person'
taken straight off the notes on back of the form
I'm getting fed up of flippant comments on this forum making out I'm a **** electrician. So thank you all for making me feel **** and doubting my ability
Napit MWC do permit a single circuit new install.
Napit MWC do permit a single circuit new install.
Napit MWC do permit a single circuit new install.
Plus Schedule of inspections and schedule of test results!
Must be a NAPIT thing then....
TBH I have never known a MWC to be used for the addition of a new circuit. NAPIT obviously permit it on their MWC so if they stand by it then I don't have a problem. What does it say in the BGB regarding this (mines in work lol)
What does it say in the BGB regarding this (mines in work lol)
I fill out test sheets according to NAPIT rules as I pay enough every year to be with them. It wasn't your comments on this thread making me throw my dummy out of the pram, it was abusive PMs. The moderators have now fixed this. Your comments just topped it off.
I came on here to talk about electrics and have a laugh, all I've had over 24 hrs of abuse. Sorry for flipping, just had all I could handle and I knew what my form said
I bet you'll get flooded with apologies Kate, they should remember that a woman is always right!I fill out test sheets according to NAPIT rules as I pay enough every year to be with them. It wasn't your comments on this thread making me throw my dummy out of the pram, it was abusive PMs. The moderators have now fixed this. Your comments just topped it off.
I came on here to talk about electrics and have a laugh, all I've had over 24 hrs of abuse. Sorry for flipping, just had all I could handle and I knew what my form said
You should be working to BS7671, not NAPITS rules. They are just a competent person scheme.
BS7671 says minor works are NOT for new circuits.
The minor works certificate is intended to be used for additions and alterations to an installation that do not extend to the provision of a new circuit and so on.
BS 7671 are also only guidelines.
if as has been said previously competent persons scheme is happy for it too be used in this way then there are no problems.
Reply to what documents should be completed after initial veritication? in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.