This is an EIC (Electrical Installation Certificate), complete with Schedule of Inspections and General Schedule of Test Results, in the format of a PDF. You can fill out the details using any PDF reader. It is derived from, and pretty much identical to, the IET model forms, at...
Afternoon all.
Can I confirm that a protective conductor in section 16 of an EIC refers to bonding to services etc rather than a cpc of a final circuit?
Query when filling out EIC for an additional circuit,
When filling out an EIC for additional circuit, Is the tick sheet applicable to that circuit only or is is talking about the installation as a whole? For example where it states Cables correctly supported throughout their run obviously this...
doing a EIC for new installation on a flat fed by a 16mm t/e.
Main fuse (100A) feeds fuse switch (63A) to cu in flat.
My question is; Ze taken from main fuse, Zdb taken from cu. but when filling in main switch, tails and earthing conductor, do I record what runs from main fuse to fuse switch...
Evening all..
I have an editable version of an EICR thanks to Murdoch and also a MWC thanks to Happysteve but I cannot find an EIC. I have looked at the Stroma ones and don't get on with them.
Anyone?
Cheers.
Dont know if anyone can help but not so long ago there was a poster on here, who posted a link with every item on the tick list explained/simplified. Anyone help me to find it again?
Hi,
If you were to change a distribution board within an commercial environment, and you couldn't get access to circuits for R1R2/ Max Zs, previous test results saying unknown on circuits.
Surely you cannot issue an EIC Cert as you cannot verify circuits are compliant as it is virtually...
Wardy1980
Thread
becsa
certification
competent
cps
eiceicr
person
scheme
I'm coming across more and more clients who have Part P "certificate" but they haven't been given an EIC (or in some cases a MWC).
Irrespective of who "orders" the work, I always give a copy to the home owner .....
What do others do?
Just wondering................... if I am wasting my time...
I was talking to a fellow spark today and he said I have gone about this wrong. But I disagree so I would like your opinions.
Been out to a property with and old rewirable fuse board.
(I don't know what that's defined as).
They had a spur out the back feeding a disconnected 2.5mm T&E feed in...
Sitting (or rather squeezing my belly into my tiny CU cupboard ) my NICEIC assessment (to join) next week. My case study is a new 6A radial circuit. It has its own way in the CU.
Do I complete an EIC on the basis that it's a new installation or an EICR on basis that it's connected to an existing...
I know the logic in this doesn't make sense... But
If you install a new circuit in a 17th edition plastic consumer unit, but changed the consumer unit to a metal one the following day... What certification would you need?
Would you need an EIC for the new circuit? Or would you just include...
Hi all,
Would someone be able to help me and point me to a resource where I can download the current Green generic eic & eicr test sheets if such a source is available for download. I have searched and have not been succesfull in finding a resource.
Many thanks in advance
LH
Evening chaps,
A little help with what i think is a grey area. Im going to install a twin socket from the DB off the 32a ring RCBO. Does this class as an alteration where i will issue a MWC or does it warrant a EIC?
Thanks
so the NIC EIC are offering the chance to have your company logo on there advert which you can then use for your website. £60+vat
Is anyone going to use it? Do you think customers would like it?
I normally notify the job with the customers details. However the builder I work for has had a falling out with the customer due to matters not related to my work, and has said the EIC and notifying of the job is to be in his name.
Is this allowed?
Sent from my SM-N910F using Tapatalk
Hi not filled out many certificates , just done a job wiring up a shed ( 2 lights off a fused spur and a socket)came off a socket radial circuit from the garage which is supplied from a small RCD 3 way board, I've put this down as an addition to an existing circuit? And also couldn't disconnect...
Hello all,
The Schedule of Inspection forms for an EIC offer you 2 suggestions to enter in the boxes, either a tick to say an inspection has been carried out and the result is satisfactory or N/A to show that an inspection is not applicable to a particular item.
In section 7 (consumer...