P
provr6
Following on from this thread
http://www.electriciansforums.net/p...hink-my-4kw-system-needs-registering-dno.html
I've obtained a copy of the G83 notification. The DNO is listed as EDF. I thought it should be UK power Networks. Can anyone confirm?
http://www.electriciansforums.net/p...hink-my-4kw-system-needs-registering-dno.html
I've obtained a copy of the G83 notification. The DNO is listed as EDF. I thought it should be UK power Networks. Can anyone confirm?