copper???? too expensive. when a 2" nail will do the job just as well.
 
conversation i had with a builder today went something like this...............



you can't put that shower in the bathroom.

why not?

because it's 10.8kw and your cable's only 6 mill' squared.

so what?

so you need a bigger cable or a smaller shower.

why?

because the shower you've got has a FLC of over 45A, and your cable is only rated at 38A.

it'll be alright.

no it won't.

'course it will.

well, why did you ask me then?

because i wanted your advice.

so why are you arguing with me then?

i'm not, you're just wrong. everyone knows a shower's wired in 6mm cable.

see you later.

WOW!!! ............ Talk about Deja Vu - this is almost exactly the same conversation I had last week with my builder mate who I have been trying to help!!

Looks like some folk just can't or won't be helped.
 
I think what we all come across is the fact that builders/plumbers/tilers etc. are all doing electrical work that they shouldn't. When they get a chance to confirm (ask) if what they have been doing is ok, and we say it isn't, they simply get upset and argumentative because they know they're in the wrong but can't do anything about it now.
Sooo many other trades think that it's all easy and straightforward because they've watched a sparky carry out a particular job, they just rush blindly into getting it to work, then job done.
 
get rid of those horrible 3036 fuse boards and replace all 3 with a nice split load, RCD board.

might aswell RCD all circuits if its suitable, much safer than your current setup..
 
get rid of those horrible 3036 fuse boards and replace all 3 with a nice split load, RCD board.

might aswell RCD all circuits if its suitable, much safer than your current setup..

My thoughts exactly. ( >for the pessimists< My imaginary 'sparky' mate, who is not currently overseas dodging bullets for 'Queen and country. And will not be doing the legal stuff when he comes back on R&R has basically said the same. The reason I'm on here is to get an idea of what to 'fix to walls' and 'proper' cabling so when/if he gets back, he doesn't have to fish about doing the 'donkey work'... he deserves a rest after all ;))... Thanks 'shocking_eg' ... appreciate your time.
 
My thoughts exactly. ( >for the pessimists< My imaginary 'sparky' mate, who is not currently overseas dodging bullets for 'Queen and country. And will not be doing the legal stuff when he comes back on R&R has basically said the same. The reason I'm on here is to get an idea of what to 'fix to walls' and 'proper' cabling so when/if he gets back, he doesn't have to fish about doing the 'donkey work'... he deserves a rest after all ;))... Thanks 'shocking_eg' ... appreciate your time.

No worries mate. Don't take any notice of some of the above "pee" takers lol

How have you got your shower back on for the meantime then ?
 
al fresco job?

29a.jpg
 
No worries mate. Don't take any notice of some of the above "pee" takers lol

How have you got your shower back on for the meantime then ?

I haven't... Back to 'Bath nights' lol. And being a Paramedic, getting covered in other peoples 'pieces', its times like this you really do miss the shower! Still, the bubbles are fun!
 
My thoughts exactly. ( >for the pessimists< My imaginary 'sparky' mate, who is not currently overseas dodging bullets for 'Queen and country. And will not be doing the legal stuff when he comes back on R&R has basically said the same. The reason I'm on here is to get an idea of what to 'fix to walls' and 'proper' cabling so when/if he gets back, he doesn't have to fish about doing the 'donkey work'... he deserves a rest after all ;))... Thanks 'shocking_eg' ... appreciate your time.

That may be fine waiting for your mate coming home to replace the old fuse boards with a modern dual RCD CU but what are you going to do about the shower?? I don't think for a minute your going to wait for your mate to refurbish this blown out switch fuse etc!! So if your going to be doing the re-wire and connections etc, no safety installation testing is going to be conducted, which is all a bit silly, even niaeve considering that you have seen what can happen when things are not right!!

The other problem your going to face, is that your mate won't be with a Part Pee scheme provider, so from a legal standpoint, wont be an official installation. Unless of course he/you goes through the LABC, which could cost more than the replacement of the old CU's to the new CU!!
 

Reply to Is it meant to do this? in the Electricians' Talk area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top