Hi all,
A friend of mine who owns a shop has asked me if I can do some load balancing on the three phase board in the shop.
In my career I have mostly done domestic and light commercial so three phase load balancing is something I havent yet carried out.
Am i right in thinking it is just a case of assessing what each phase is using and re arranging the DB to more evenly spread the load?
Or is there a lot more to it than that?
Any advice/feedback appreciated.
A friend of mine who owns a shop has asked me if I can do some load balancing on the three phase board in the shop.
In my career I have mostly done domestic and light commercial so three phase load balancing is something I havent yet carried out.
Am i right in thinking it is just a case of assessing what each phase is using and re arranging the DB to more evenly spread the load?
Or is there a lot more to it than that?
Any advice/feedback appreciated.