Same job. different problem.
The heating system was being changed from a system boiler and tank to a combi. I have asked since day 1 what was needed at the boiler, which cables needed to stay and what could be removed.
Never got an answer, so I left everything.
The heating engineers turned up - (big national with the initials BG) - in 3 separate vans, 2 weeks later than they first said, and got to work.
After the plastering had been done.
I wasn't on site that day, got back to all cables pulled out, and surface trunking running a feed to the boiler.
They left the homeowners tank and bags of scrap copper on his lawn. It stayed there for 3 days. I texted the homeowner and mentioned it. He asks;- "Could you take it to the scrappies, and we'll go halfers?"
The guy is very proud of his lawn and thought the tank sitting would kill off the grass. I was only too happy to oblige
The heating system was being changed from a system boiler and tank to a combi. I have asked since day 1 what was needed at the boiler, which cables needed to stay and what could be removed.
Never got an answer, so I left everything.
The heating engineers turned up - (big national with the initials BG) - in 3 separate vans, 2 weeks later than they first said, and got to work.
After the plastering had been done.
I wasn't on site that day, got back to all cables pulled out, and surface trunking running a feed to the boiler.
They left the homeowners tank and bags of scrap copper on his lawn. It stayed there for 3 days. I texted the homeowner and mentioned it. He asks;- "Could you take it to the scrappies, and we'll go halfers?"
The guy is very proud of his lawn and thought the tank sitting would kill off the grass. I was only too happy to oblige