- Reaction score
- 1
Hi all, I've been asked to supply a large outbuilding thats to be used as offices via overhead catenary wire. The suspended length is about 50M. Does anyone have experience with this? My plan was to erect a telegraph pole half way and use 25mm 2 core SWA. Would something like split con cable be a better option? is it lighter?
Thanks
Thanks