Sounds like a crap job to me, are you short of work? I bet you don't get it all done in a day, all you need is a few of those 15 swap outs to go south, short or otherwise poor cables, other stuff that a proper spark can't help but having to sort, grommets missing etc, plus any cosmetic damage that might need sorting, along with back boxes that might need re-fixing or tapping. I reckon you need 2 days, could be 2 long days at that, plus how much are you paying your "mate". Then there is the testing for the MW cert, making sure everything disconnected for testing, IR tests always take quite a while, checking for appliances plugged in, boilers, etc etc. I'd stick to nice little CU changes............