Search the forum,

Discuss Water bond? in the UK Electrical Forum area at ElectriciansForums.net

Ross1

-
Reaction score
16
If a property is full of PVC push fit fittings on the copper plumbing and only about a meter and half underground before entering the house because before that it's PVC again, what is the bonding requirements?
 
Without seeing the full picture , if your incoming supply is metal and in contact with earth it should be bonded near the stopcock, if its plastic / copper combinations you will have to use your own judgment of the situation. If it is bringing an earth potential into the building it must be bonded.


Go to the IET site and search "Wiring Matters" There is an article about plastic /metal combinations , and bonding. Also the OSG covers it too.
 
Last edited:
Totally agree with Ruston, Dosent matter how small that section of copper is, it is allowing a potential to enter the building and must be bonded in my opinion.
 
Totally agree with Ruston, Dosent matter how small that section of copper is, it is allowing an earth potential to enter the building and must be bonded in my opinion.
 
Without seeing the full picture , if your incoming supply is metal and in contact with earth it should be bonded near the stopcock, if its plastic / copper combinations you will have to use your own judgment of the situation. If it is bringing an earth potential into the building it must be bonded.

Must bond at incoming (stopcock) because of short piece of copper incoming. But would be impossible to crossbond every short piece of copper to copper.
 
Must bond at incoming (stopcock) because of short piece of copper incoming. But would be impossible to crossbond every short piece of copper to copper.


Sounds like a lash up, why is the incomer copper , and why have they used plastic joins to the copper piping.

A few pics would be nice to get a full view of this. . See the edit to my last post for guidance. We can't see the installation so is hard to say what you need.to do.but if your incomer is metal it needs to be bonded.
 

Reply to Water bond? in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

No waffling, going to get straight to the point. Main water on the exterior of the building in plastic. Changes to copper inside the building...
Replies
24
Views
982
Greetings, I am homeowner and looking to confirm if I will need earth boding to water pipes. There is already earth boding near Gas meter and the...
Replies
23
Views
1K
In my bathroom there is supplementary bonding of the bath, bath pipework, and basin pipework before it goes into trunking and exits unconnected in...
Replies
6
Views
444
Doing an EICR on a commercial install, there’s a copper pipe comes down a pipe chase with the stop cock fitted onto it, it’s then pvc pipes that...
Replies
2
Views
362
Not sure on this one. Mains water is coming up from the ground in lead pipe in bathroom. 2 inches of copper pipe before the stop tap. All...
Replies
4
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top