OP
BristolSpark
DNO/service head in a cupboard on ground floor, feeds to a henley block then this feeds to 5 x switches. Each flat currently has 16mm T&E fed to them. One flat has already been done via a previous electrician very recent too.
The only way to feed a supply as in a fresh supply to this flat is via trunking and following the contour of the staircase up 3 floors. No access to the outside.
Hence the option to try and utilise the existing supply as it tests good.
The only way to feed a supply as in a fresh supply to this flat is via trunking and following the contour of the staircase up 3 floors. No access to the outside.
Hence the option to try and utilise the existing supply as it tests good.