Just looked at number 7 , if it's a standard s-plan with spring return valves you do not need ch off and ch satisfied from the room thermostat and programmer.

number 4 on programmer should be connected to common on room thermostat, SL from room thermostat should be connected to brown on the two port valve. The only time you really use the ch satisfied on thermostat and ch off on programmer is if you have motor open/motor closed valves.
 
If you are still having problems with it after you have checked the programmer wiring you can PM me the make/model of the individual components such as boiler, valves, room stat, cylinder stat, programmer, etc I can make you up a drawing specific for the components you have if need be.
 
Thanks for everyone's input, really appreciated. It sounds like those two wires are not needed then if spring return, so it could be a simple case of mixed up output on programmer. I think the biggest problem here is that too many people have meddled about with things they don't know about.

That may sound a bit rich coming from me, but before I touched anything I downloaded the s-plan wiring diagram and checked all wiring and was then able to diagnose and fix the cylinder stat issue. Now it's just a case of getting the programmer to do it's job on the CH.

Thanks again.
 
Thanks for everyone's input, really appreciated. It sounds like those two wires are not needed then if spring return, so it could be a simple case of mixed up output on programmer. I think the biggest problem here is that too many people have meddled about with things they don't know about.

That may sound a bit rich coming from me, but before I touched anything I downloaded the s-plan wiring diagram and checked all wiring and was then able to diagnose and fix the cylinder stat issue. Now it's just a case of getting the programmer to do it's job on the CH.

Thanks again.

It's a good idea to take some piccies of it before you start playing with it so you have a point of reference to refer to after you've bolloxed it up.

I believe modern mobile phones have built-in cameras that couls be useful for this sort of thing.
 
he's not yet tried a blowlamp or gaffer tape yet. what sort of a plumber is he?
 
It's a good idea to take some piccies of it before you start playing with it so you have a point of reference to refer to after you've bolloxed it up.

I believe modern mobile phones have built-in cameras that couls be useful for this sort of thing.

Hey Geordie,

I did just that, but I haven't touched anything in the wiring centre. All i have done is label up all the cables going into it, check the connections against a downloaded s-plan wiring diagram, and sort out the cylinder stat.

The old lady is happy now the programmer is switching on the boiler at the required time, and the stat is limiting the HW to the required level. All is good there. It means that she no longer has to switch on the immersion then remember to switch it off again, so result there.

In setting the times on the programmer, she phoned me a few hours later when the CH was supposed to come on and didn't, I went back up the road to discover that the only way I could get the CH to come 'on' was by switching it 'off' on the programmer. I left it at that for the night so as she could have heating.

I would like to get to the bottom of the problem so she can have full control over her system.

This isn't a paying job, it's a favour for a dear old lady of the village I have recently moved to. I am very hesitant in that I don't want to make any false moves that would leave her without heating as she is recently widowed and is receiving treatment for cancer.

Thanks for everyone's input.

Voltz
 
well done to you for helping the old dear out FOC. a gesture like this could do you some favours in a new village. hope you get to the bottom of the problem soon. .
 
Hey Geordie,

I did just that, but I haven't touched anything in the wiring centre. All i have done is label up all the cables going into it, check the connections against a downloaded s-plan wiring diagram, and sort out the cylinder stat.

The old lady is happy now the programmer is switching on the boiler at the required time, and the stat is limiting the HW to the required level. All is good there. It means that she no longer has to switch on the immersion then remember to switch it off again, so result there.

In setting the times on the programmer, she phoned me a few hours later when the CH was supposed to come on and didn't, I went back up the road to discover that the only way I could get the CH to come 'on' was by switching it 'off' on the programmer. I left it at that for the night so as she could have heating.

I would like to get to the bottom of the problem so she can have full control over her system.

This isn't a paying job, it's a favour for a dear old lady of the village I have recently moved to. I am very hesitant in that I don't want to make any false moves that would leave her without heating as she is recently widowed and is receiving treatment for cancer.

Thanks for everyone's input.

Voltz

Good lad!

Keep up the good work! :hurray:

I used to do jobs like this for an old biddy who never stopped yapping from the moment I arrived to the moment I left with my ears ringing! I never knew what she was yapping about and I'm sure she didn't either!

She phoned me one day in hysterics because the bedroom carpet was wet and she thought it was something to do with the radiator so off I went to have a looksee and found the radiator life expired & leaking.

Off to the merchant and returned with a new radiator which was the nearest metric size to the original and that meant bending an offset into one of the tails to make it line up with the rad. valve.

Job done, money paid & off I went

Two days later phone rings & it's the old biddy and she's not happy with the bent pipe and she's shown it to her friends and her daughter who is a Solicitors Clerk and they all agree with her that it's "not right".

I explained to her that the alternative would be lifting a bit of carpet back, lifting a floorboard and modifying the pipe under the floor to allow for the tail to be straight.

She wasn't happy but wasn't going to have her carpet disturbed which was why I chose the offset option in the first place and unless she would let my lift the carpet she would just have to accept the job the way I had done it.

After what seemed an eternity, she agreed to my lifting the carpet & floorboard and that's when I found the pipe happily sitting in nicely formed notches in the joists with one 2.5 cable jammed down the side of it and it's brother jammed on the top of it. Both these cables were missing their grey coats due to the heat from the pipe and the red & black insulation was exposed.

I replaced both cables and ran them through holes I drilled through the joists well away from the pipe.

I often wonder how long it would have been before something went bang.
 
If the programmer doesn't provide voltage on the channels when it should, check the polarity on the pgmr backplate and ensure that 1 and 2 are the correct way around. If reversed the programmer will still run but will present 0 volts on the channel when timed on. One of a few issues I encountered on Tuesday ;)
 

Reply to central heating systems help! in the Central Heating Systems area at ElectriciansForums.net

Similar Threads

I have a fully pumped Y plan heating system using a Potterton EP2 programmer. Drayton MA1 Diverter valve. I have just replaced the Actuator head...
Replies
4
Views
619
I've always thought I was quite good a wiring heating systems, I can do Y plan, S plan, UFH set ups, "normal" thermal stores etc, you name it and...
Replies
4
Views
952
Hi everyone, my house has an air-to-heat system that generates hot water in a boiler. This boiler is then connected to the central heating...
Replies
1
Views
814
Good evening, I have recently moved into a new home and I am having problems with the MCB/RCD tripping (Mem M6 Type 3 - 30mA). It intermittently...
Replies
8
Views
1K
I currently have a home with 7 interconnected, hard-wired smoke detectors. I have a hard-wired heat alarm in the garage that I need to have...
Replies
4
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock