- Reaction score
- 0
Hi Everyone, I have gone back to using hand written certs a lot easier and all completed on site. The problem is with the elecsa certs when doing a consumer unit upgrade the comments on existing installation box is too small to fill in all observations so I have seen a observation continuation sheet in the elecsa online shop I know these are for PIRs but I cant see anything wrong with submitting one of these with the installation cert with all observations made so I cover myself. Any thoughts anyone ????