- Reaction score
- 10,616
Was going to post something, but see Lee's been cutting & pasting (go on, where u orrffh Lee?)
Long time since I've done a job on timber framed, and even lived in one for a while. I seem to recall, there is a 30mm service void between the back of the finished plasterboard and the timber frame/celotex etc?
I suspect this builder has done a few before, but has probably fallen out with his resident electrician (electrician has found out about the builders mark up), and is now trying to find another sparks to chuck in a few wires, like you do.
Long time since I've done a job on timber framed, and even lived in one for a while. I seem to recall, there is a 30mm service void between the back of the finished plasterboard and the timber frame/celotex etc?
I suspect this builder has done a few before, but has probably fallen out with his resident electrician (electrician has found out about the builders mark up), and is now trying to find another sparks to chuck in a few wires, like you do.