Hi All
First off - Im not an electrician (can just about handle changing a light bulb).
Im looking at setting-up an arts and craft village and tea room in a coastal resort.
I will need to get a new power supply to upto 20 wooden sheds and a tea room.
I estimate that;
15 sheds will use a single twin socket and a light and
5 will use power for educational classes (things like potters wheel etc) and
the tea shop will use an ice cream machine, single-phase coffee machine, fridge and freezer.
The ground to be covered would be approx 100m from one end to other of site (sheds would be sited along straight edge of site).
Questions;
1) Would I need a single-phase or three-phase supply.
2) Anyone know the price difference power co would charge to get three-phase v single-phase supply to site (ie 2x price, 3x etc). I believe the three-phase supply is only around 30m away.
3) Any idea on price to get site installation done with 21 connection points (20 shed, 1 shop). The ground is grass. Would caravan park hookups be best option to go?
4) Anything I need to be careful of when appointing electrician for the work?
Appreciate your thoughts and ideas on this before I get too deeply involved in project.
Thanks
First off - Im not an electrician (can just about handle changing a light bulb).
Im looking at setting-up an arts and craft village and tea room in a coastal resort.
I will need to get a new power supply to upto 20 wooden sheds and a tea room.
I estimate that;
15 sheds will use a single twin socket and a light and
5 will use power for educational classes (things like potters wheel etc) and
the tea shop will use an ice cream machine, single-phase coffee machine, fridge and freezer.
The ground to be covered would be approx 100m from one end to other of site (sheds would be sited along straight edge of site).
Questions;
1) Would I need a single-phase or three-phase supply.
2) Anyone know the price difference power co would charge to get three-phase v single-phase supply to site (ie 2x price, 3x etc). I believe the three-phase supply is only around 30m away.
3) Any idea on price to get site installation done with 21 connection points (20 shed, 1 shop). The ground is grass. Would caravan park hookups be best option to go?
4) Anything I need to be careful of when appointing electrician for the work?
Appreciate your thoughts and ideas on this before I get too deeply involved in project.
Thanks