So working in. Shopping centre and admiring the awfull tray work in the carpark.

Look what I found, this is the 11kv tri for the TX. Nice!!, think its safe to say that in this case the tray bond was required.
3y9ujesu.jpg
 
The cable istallation is bloody terrible!!

they should be securely cleated and if triplex is used, special cleats are available, that maintain the twist of the trefoil.
id be ashamed to leave that!
 
The cable istallation is bloody terrible!!

they should be securely cleated and if triplex is used, special cleats are available, that maintain the twist of the trefoil.
id be ashamed to leave that!

Oh the cleats are up there but only maintaining the tri. It's just lying on the tray not even bothered with zip ties
 
It would have taken longer to put the earth link on than it would have done to cut the flange and bolt the two trays together. :frown:
 
So working in. Shopping centre and admiring the awfull tray work in the carpark.

Look what I found, this is the 11kv tri for the TX. Nice!!, think its safe to say that in this case the tray bond was required.
3y9ujesu.jpg

Ive seen worse M8 TBH, it isn't great admittedly, but not a gasp situation IMO, although a rough Job.
 
Totally down to the site supervision, both from the contractors themselves, and the clients supervision!! Or should i say the LACK of it!!! lol!! The installation as shown, is a potential disaster waiting to happen to be honest!!
 
The worrying point of this installation for the 11KV cables, is that MV cables don't like any areas of ''point pressure''. It can/will over time create a weakness at that point, where the higher voltage can penetrate the insulation to the semi conductive layer and on to the copper screening foils/tapes and beyond!! Seen this phenomena with MV/HV cables a good few times before. The problem is not so much the metal tray slightly penetrating the PVC over-sheath, it's the voltage trying to break through any weakness in the boundaries put in place to contain that voltage!! It's not as simple as your normal LV cable situations!!
 
That's terible a nice gusset bend in there would have done the trick. Bet the cable was short when it was pulled in and they've done that to gain a few inches lol.
 
Ok now I'm going to tell you that that is a shopping centre car park, the trays are on the ceiling and can easily be touched as the trays are only about 6'6" off the floor, very low ceiling indeed.
 
Ok now I'm going to tell you that that is a shopping centre car park, the trays are on the ceiling and can easily be touched as the trays are only about 6'6" off the floor, very low ceiling indeed.

Should be nicely formed in that tray with tray lids. Yeeeeehaaaa
 
To be honest it looks like it's buckled or they've half arsed tried to bend the side.

But the bottom one has definitely been hit
 
Last edited by a moderator:
I also think someone might have driven or reversed a vehicle into it. It's difficult to say without seeing it from further away but the height changes on the right hand tray don't make sense even as a cowboy install job..
 
So working in. Shopping centre and admiring the awfull tray work in the carpark.

Look what I found, this is the 11kv tri for the TX. Nice!!, think its safe to say that in this case the tray bond was required.
3y9ujesu.jpg

looking at that, I would say that the tray has most likely been put in by some underpaid labourer who wasn't interested, they have put this in before the steel work was even finished hence the jotum spraypaint all over it, then they probably got paid off during the usual agency rotations, the job was probably behind on the concrete or something similar......the cable pullers have been in and pulled it over the tray with a few cable ties to get it to turn in the way they wanted it, they would have been in and out as fast as possible, then the steelwork got finished and sprayed white, going onto the tray and cables at the same time...

you can see it was done fast and untidy, the screwed rods are all odd sizes etc...and the ends are bent where somebody has been shoving an alloy tower about to put the cables on there....
 

Reply to Not such good tray work. in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Last weekend I experienced a weird electrical fault with my 2010 Peugeot Boxer Van. A little background - the van is a 2010 Boxer 330 2.2 Short...
Replies
3
Views
844
So I have tried applying to every electrician mate/improver jobs there is on every job websites and I got a few calls saying that they want guys...
Replies
2
Views
1K
NICEIC Certification Scheme Getting accredited to
Looking for some advice regarding joining a CPS. I've been in the electrical industry in various roles for nearly 10 years. I started my...
Replies
15
Views
1K
Hi, I am 17 years old and my main goal was to become an electrician. But I have been hearing from people that becoming a gas safety technician...
Replies
14
Views
1K
Looking for a bit of advice from the wider audience / those who may have done similar before. I entered the game a bit later / in a non...
Replies
12
Views
785

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock