- Reaction score
- 5
Hindsight is a wonderful thing but gives some good learning points. Best to test the installation before conducting any works to see if you will inherit a problem. Best done with the customer and other trades out of the way and not interfering. With a change of consumer unit you may not have the length of cables required to make it look good or follow the convention of highest load next to the incomer but have to go your best when under the scrutiny of other trades and the unqualified internet experts. Testing upon completion also helps to defend your position especially as other trades continue to work on site. It is possible some disturbance may have occurred unbeknown to them or others. Due to the delay of four days before a problem is noticed it could be weather related - outdoor lighting? Could it be component failure, even if new equipment? Could be the neutral of one circuit being returned to the other neutral bar - split load board but has been known. Interference, additional circuits or modifications since departing site? Some things to consider.