Discuss Permanent Diesel Generators Installed Inside a Building in the Electricians' Talk area at ElectriciansForums.net
No sorry.Do somone know requirements for Permanent Diesel Generators Installed Inside a Building ?
Is this a Standby Set, or a Base Load set up? Things to consider:Do somone know requirements for Permanent Diesel Generators Installed Inside a Building ?
I think he means a generator that is permanent, as in not a temporary one on hire.Is this as a backup or permanent supply?
Yes, I realise that.What I meant was, is it the only power supply or a backup to mains electricity
It is for a permanently installed generator for back up inside a building.
I have worked on a couple of jobs where back-up generators have been a requirement from the fire strategy document to power fire fighting lifts, smoke extract systems and sprinkler pumps. What particular requirements are you trying to find out?
I have worked on a couple of jobs where back-up generators have been a requirement from the fire strategy document to power fire fighting lifts, smoke extract systems and sprinkler pumps. What particular requirements are you trying to find out?
What about requirements for generator room dimension or does exist any particular regulations for it.
What particularly is it backing up?
Whats your scope of works?
Do you have a kVA load the generator needs to support?
Don't forget EM lighting either, non slip flooring, emergency exits large entry doors for getting large equipment in and out.I have to make a design for generator room with all installations ( ventilation, air supply, exhaust) and obviously all wiring
Reply to Permanent Diesel Generators Installed Inside a Building in the Electricians' Talk area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.